  • The United States Trade and Development Agency is supporting this project with $997 million Very massive project to stand in the Ibeju-Lekki axis come 2019.
  • It is the largest industrial complex in Africa.
  • The project site is larger than Victoria Island. It is located on 2135 hectares of land in Epe, Lagos near the Lekki Free Zone.
  • Billions of Naira was paid to acquire the land and to settle the existing communities. More money was also allocated and spent to relocate the existing communities.
  • It is the largest single train refinery project on the planet.
  • It is the largest single train grass roots refinery in the world with a processing capacity of 650,000 BPSD.
  • The plant has an export value of $6 billion per annum, meaning Dangote’s efforts will increase the amount of foreign exchange in Nigeria’s foreign reserves by at least 40% of current value on a yearly basis.
  • This project will restore the dignity of Nigeria, a crude producing country that has for years gone abroad to meet its demand for refined products.
  • The project created job opportunities for over 25,000 Nigerians.
  • All the civil engineering is done by Nigerian companies.
  • Work goes on, on the site, 24 hours a day, 7 days a week
  • World Record 2.72 million accident free hours recorded on site, without a single lost time to injuries.
  • The project is slated to cost $14 billion (N2.8 trillion) of which Dangote is contributing $7 billion in equity.
  • Over $4 billion worth of equipment currently sits on the site.
  • Dangote is investing over $7 billion (N1.4 trillion) in the project.
  • Dangote Group brought in the world’s #1, #2, and #5 sand dredgers to sand fill the site. 60% of the land being swampy. So far these dredgers have reclaimed 13 million m³ out of 30 million m³.
  • Dangote is producing its own electricity to power the plant and by so doing is saving 75% costs. Dangote produces electricity at a rate that is significantly cheaper than the Federal Government. Dangote’s cost is $400,000/MW, while Federal Government is $2,000,000/MW.
  • Refined products to be produced at the plant include but not limited to propane, petrol, Jet Fuel, Diesel, Kerosene, Carbon Black, Polypropylene, and Polyethylene.
  • The Ammonia component of the plant will produce 2.8 million tonnes of Urea.
  • When this project comes online, Nigeria will save a minimum of $10 billion a year on imports.
  • Dangote said when this project comes on line, his friend Femi Otedola will save at least N26 per liter on millions of liters of diesel and petrol which his companies import annually. This savings will be passed on to the consumers and it will take a lot of pressure off the banks.